Fire Doors
Fire Door Repairs
On-site repair of deficient fire door assemblies by certified technicians — restoring compliance quickly and minimizing disruption to your occupied healthcare facility.
What We Repair
Door Closers
Adjustment, repair, or replacement of door closers to ensure positive self-closing from any open position.
Latching Hardware
Repair or replacement of latches, strikes, and coordinators to ensure positive latching per NFPA 80.
Hinges & Pivots
Replacement of damaged or non-compliant hinges and pivot hardware.
Smoke Seals & Gasketing
Installation or replacement of intumescent seals and smoke gasketing to restore barrier integrity.
Clearance Corrections
Adjustment of door and frame components to bring clearances within NFPA 80 tolerances.
Frame Repairs
Repair of damaged door frames to restore the integrity of the fire door assembly.
All doors are tested and documented to NFPA standards located in sections NFPA101-2012: 7.2.1.5.10.1 · 7.2.1.5.11 · 7.2.1.15 | NFPA 80-2010: 4.8.4 · 5.2.1 · 5.2.3 · 5.2.4 · 5.2.6 · 5.2.7 · 6.3.1.7 | NFPA 105-2010: 5.2.1
JGE Inspection Protocol
- 1Labels are clearly visible and legible.
- 2No open holes or breaks exist in surfaces of either the door or frame.
- 3Glazing, vision light frames, and glazing beads are intact and securely fastened in place, if so equipped.
- 4The door, frame, hinges and hardware and non-combustible threshold are secured, aligned and in working order with no visible signs of damage.
- 5No parts are missing or broken.
- 6Door clearances do not exceed clearances listed in 4.8.4 and 6.3.1.7.
- 7The self-closing device is operational; that is, the active door completely closes when operated from the full open position.
- 8If a coordinator is installed, the inactive leaf closes before the active leaf.
- 9Latching hardware operates and secures the door when it is in the closed position.
- 10Auxiliary hardware items, which interfere or prohibit operation, are not installed on the door or frame.
- 11No field modifications to the door assembly have been performed that void the label.
- 12Meeting edge protection, gasketing or edge seals, where required, are inspected to verify their presence and integrity.
- 13Signage affixed to a door meets the requirements listed in 4.1.4.